Heru Marine Surveys · Zeebrugge

Bunker and marinesurveys in theARA ports

Confirmed within 15 minutes
Signed report within 24 hours

Film: Tom Fisk, Pexels · stand-in
Surveys

Five surveys, at berth or at anchorage

Independent quantity, ROB, on/off-hire, hold and sealing surveys across the ARA ports. Each one ends the same way: figures you can rely on and a signed report within 24 hours.

Request a survey
  • A bunker barge and a water barge alongside a cargo ship
    Survey 01 · ISO 13739

    Bunker quantity survey

    We measure what the barge delivers and what the vessel receives. Procedures follow ISO 13739.

    WhenBefore and after delivery
    WhereBerth or anchorage
    ReportWithin 24 h
    • Barge and vessel tanks sounded before and after the transfer
    • Temperatures and densities recorded, volumes corrected
    • Sampling witnessed, samples sealed and labelled
    • Any difference recorded and reported the same day
    Request this survey
  • Daylight falling into an empty barge tank with its pipework
    Survey 02 · Every grade

    ROB survey

    We sound every bunker tank and record what remains on board, grade by grade, at a set moment.

    WhenAt a set moment
    WhereBerth or anchorage
    ReportWithin 24 h
    • All bunker tanks sounded, including settling and service tanks
    • Quantities per grade, corrected to standard conditions
    • Signed by the vessel's officer and the surveyor
    Request this survey
  • A tanker's hull and accommodation alongside in the port of Antwerp
    Survey 03 · Time charters

    On/off-hire survey

    At delivery or redelivery under a time charter, we record the bunkers on board and the vessel's condition.

    WhenDelivery or redelivery
    WhereBerth or anchorage
    ReportWithin 24 h
    • Bunker figures per grade at the time of delivery or redelivery
    • Condition of holds, hatches and accessible areas, with photos
    • One set of figures for both parties
    Request this survey
  • Closed red hatch covers on the deck of a cargo ship
    Survey 04 · Before loading

    Hold cleanliness inspection

    We inspect the holds against the standard the charter party or shipper requires, and record what we find.

    WhenBefore loading
    WhereBerth or anchorage
    ReportWithin 24 h
    • Every hold inspected and photographed
    • Residues, rust scale, moisture and odour noted
    • A clear result per hold, with reasons
    Request this survey
  • A tanker's deck with its pipework and hatches at dusk
    Survey 05 · Cargo spaces

    Sealing and unsealing

    We seal hatches, tanks or other cargo spaces and record each seal. When appointed, we check the seals before they are broken.

    WhenSealing or unsealing
    WhereBerth or anchorage
    ReportWithin 24 h
    • Seal numbers and positions recorded with photos
    • Seals checked intact before unsealing
    • Seal certificate issued the same day
    Request this survey
Not sure which?Send what you know. We tell you which survey fits.
A bunker barge and a water barge alongside a cargo ship
Survey 01 · ISO 13739

Bunker quantity survey

We measure what the barge delivers and what the vessel receives. Procedures follow ISO 13739.

WhenBefore and after delivery
WhereBerth or anchorage
ReportWithin 24 h
  • Barge and vessel tanks sounded before and after the transfer
  • Temperatures and densities recorded, volumes corrected
  • Sampling witnessed, samples sealed and labelled
  • Any difference recorded and reported the same day
Request this survey
  • IndependentNo supplier ties

    One set of figures for buyer, seller and charterer.

  • StandardISO 13739

    Bunker quantity surveys, with volumes corrected to standard temperature.

  • Coverage6 ARA ports

    Antwerp, Rotterdam, Amsterdam, Zeebrugge, Ghent and Ostend.

  • On call24/7

    Day and night, weekends included, from a base on the Belgian coast.

About

Independent figures

Heru measures what is in the tanks and records what is in the holds, for whichever party appoints us.

We have no links to any bunker supplier. The buyer, the seller and the charterer read the same figures, whoever appointed us.

Surveys are carried out at berth and at anchorage in Antwerp, Rotterdam, Amsterdam, Zeebrugge, Ghent and Ostend, from a base on the Belgian coast.

How a survey works
A small bunker tanker alongside in port
A port jetty lit at night, with the terminals across the water
Commitments

What you can count on

The process
Confirmation15 min

Every request confirmed

Day and night, weekends included.

Preliminary findingsSame day

Key figures on the day

By email or WhatsApp, with any difference flagged.

Final report24 h

Signed report

Figures, calculations, seal numbers, photos.

Clients

Who we work for

Any party with an interest in the vessel, the bunkers or the cargo.

The vessel

Time charterers and ship operators

Bunker quantity at each delivery. On/off-hire figures at the start and end of a charter.

The vessel

Shipowners and managers

ROB and on/off-hire surveys for the owner's side. Hold inspections before loading.

The bunkers

Bunker traders and brokers

Independent figures when a delivered quantity is questioned.

The vessel

Ship agents

One contact who attends at short notice on behalf of your principal.

The cargo

Commodity traders

Hold cleanliness before loading. Seals on cargo spaces.

Process

One survey, hour by hour

A bunker quantity survey in Antwerp, requested at night. The times show how the commitments work.

Example, not a real job
  1. Request

    By form, phone or WhatsApp. Vessel, IMO, port, ETA and grades are enough to start.

    A port jetty lit at night, with the terminals across the water
  2. Confirmed

    Who attends, and when. The attendance time is agreed with you.

    Within 15 min
    A loaded cargo ship at its berth in the port of Antwerp at dusk
  3. On board and measuring

    The surveyor meets the responsible officer and the barge master. Tanks sounded before and after, temperatures taken, samples sealed and labelled.

    A bunker barge and a water barge alongside a cargo ship
  4. Preliminary findings

    The key figures and any difference, by email or WhatsApp.

    Same day
    Daylight falling into an empty barge tank with its pipework
  5. Signed report

    Tank-by-tank figures, calculations, seal numbers, photos and copies of the documents signed on board.

    Within 24 h
    A tanker's deck with its pipework and hatches at dusk
Ports

Ports we cover

Six ports in the Antwerp–Rotterdam–Amsterdam region, at berth and at anchorage.

Based on the Belgian coast, in Zeebrugge.

No.PortCountryWhere we boardSurveys
01AntwerpBelgiumBerth and anchorageAll five
02RotterdamNetherlandsBerth and anchorageAll five
03AmsterdamNetherlandsBerth and anchorageAll five
04ZeebruggeBASEBelgiumBerth and anchorageAll five
05GhentBelgiumBerth and anchorageAll five
06OstendBelgiumBerth and anchorageAll five

Draft surveys and cargo damage surveys are not offered at the moment.

QUESTIONS

Ports

Which ports do you cover?

Antwerp, Rotterdam, Amsterdam, Zeebrugge, Ghent and Ostend, at berth and at anchorage.

Timing

How quickly can you attend?

We confirm every request within 15 minutes, day and night. The attendance time depends on the port and the notice given. We agree it with you when we confirm.

Appointment

Who can appoint you?

Any party: charterers, operators, owners, managers, traders, brokers or agents. For quantity surveys we have no ties to bunker suppliers.

Standards

Which standards do you follow?

Bunker quantity surveys follow ISO 13739. Volumes are corrected to standard temperature with the industry petroleum measurement tables.

Report

What is in the report?

Vessel and survey details, tank-by-tank figures, temperatures, densities and calculations, sample and seal numbers, photos, and copies of the documents signed on board.

Request

What do you need from us?

Vessel name, IMO number, port, ETA and survey type. For a bunker survey, also the grades and the nominated quantities. A nomination or written instructions help, but are not needed to start.

Price

What does a survey cost?

It depends on the survey type, the port and the timing. Send a request and we confirm the price together with the attendance.

Scope

Do you do draft surveys or cargo damage surveys?

Not at the moment. We currently offer the five surveys listed on this page.

Vessel
arriving?

Send the vessel, port and ETA. Every request confirmed within 15 minutes, day and night.

Surveyor on call · 24/7+32 479 400 881